top of page
LOGO---TOP_BOT_BORDER.png
For wet-mix moulds (made from plastic or wood) a different methodology is employed. Moulds are filled with a wetter concrete mixture and vibrated to release all the air bubbles. The moulds are then set aside for 6-24 hours to allow the mixture to set. The products are extracted and the mould used again. This method is perfect for garden ornaments and speciality cobble-stone paving.

Vibrating Table

SKU: VTABLE
ZAR 41,739.13Price
Quantity
bottom of page